Please use this identifier to cite or link to this item:
https://cuir.car.chula.ac.th/handle/123456789/38759
Title: | Time loss reduction for steel pole factory |
Other Titles: | การลดความสูญเสียด้านเวลา สำหรับโรงงานผลิตเสาเหล็ก |
Authors: | Steven Halliday |
Advisors: | Parames Chutima |
Other author: | Chulalongkorn University. Faculty of Engineering |
Issue Date: | 2004 |
Description: | Thesis (M.Eng.)--Chulalongkorn University, 2004 |
Degree Name: | Master of Engineering |
Degree Level: | Master's Degree |
Degree Discipline: | Engineering Management |
URI: | http://cuir.car.chula.ac.th/handle/123456789/38759 |
ISBN: | 9745322938 |
Type: | Thesis |
Appears in Collections: | Eng - Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Steven_ha_front.pdf | 4.26 MB | Adobe PDF | View/Open | |
Steven_ha_ch1.pdf | 3.16 MB | Adobe PDF | View/Open | |
Steven_ha_ch2.pdf | 10.68 MB | Adobe PDF | View/Open | |
Steven_ha_ch3.pdf | 9.63 MB | Adobe PDF | View/Open | |
Steven_ha_ch4.pdf | 6.24 MB | Adobe PDF | View/Open | |
Steven_ha_ch5.pdf | 11.32 MB | Adobe PDF | View/Open | |
Steven_ha_ch6.pdf | 1.98 MB | Adobe PDF | View/Open | |
Steven_ha_back.pdf | 5.72 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.